ICLL 1966 PDF

The International Convention on Load Lines (CLL), was signed in London on 5 April , amended by the Protocol and further revised in LL69 Interpretation to ICLL Reg. Rev.1 July LL70 Corrosion Margin for Hatch Cover Design. Jan LL71 Similar Stage of. Rev.1 Nov LL Position of freeboard deck on float on/float off barge carriers. (Regulation 3(9)). Rev.1 July LL Interpretation to ICLL Reg.

Author: Nagal Tolkree
Country: Cuba
Language: English (Spanish)
Genre: Science
Published (Last): 24 May 2018
Pages: 265
PDF File Size: 6.96 Mb
ePub File Size: 8.97 Mb
ISBN: 551-1-70242-712-2
Downloads: 43521
Price: Free* [*Free Regsitration Required]
Uploader: Kigajora

The difference between the Fresh Water Timber Load Line in summer and the Summer Timber Load Line is the allowance to be made for loading in fresh water at the other timber load lines.

This valve, unless required by paragraph 1may be omitted if the piping is of substantial thickness.

International Convention on Load Lines

The difference between the Fresh Water Load Line in summer and the Summer Load Line is the allowance to be made for loading in fresh water at the other load lines. EngvarB from May Use dmy dates from May Conditions, if any, on which the iclk is granted under either Article 6 2 or Article 6 4: Contracting Governments shall ensure that such control is exercised as far as is reasonable and practicable with a view to verifying that there is on board a valid certificate under the present Convention.

If the bulwark is less than 0. Various amendments were adopted in,and but they required positive acceptance by two-thirds of Ill and never came into force.

The working languages are English, French and Spanish. An existing ship in such a case shall not, as a rule, comply to a lesser extent with the requirements for a new ship than it did before.

International Convention on Load Lines (ICLL )

Ships above metres in length shall be dealt with by the Administration. Protection of crew, access to machinery spaces, etc. In all cases values at intermediate lengths shall be obtained by interpolation. In these special circumstances, the new certificate shall be valid to a date not exceeding 5 years from the date of completion of the renewal survey.

  BASIC STATISTICAL ANALYSIS SPRINTHALL PDF

Where it is obtained by fitting a superstructure, such superstructure shall extend from the stem to a point at least lcll. Effective protection for the crew icll the form of guard rails or life lines shall be provided above the deck cargo if there is no ilcl passage on or below the deck of the ship.

Where rolling types of beams are used, the arrangements shall ensure that the beams remain properly in position when the hatchway is closed. However, in order that such special freeboard may be granted and used, the timber deck cargo shall comply with certain conditions which are laid down in Regulation 44, and the ship itself shall also comply with certain conditions relating to its construction which are set out in Regulation Permanente link Permanente link Reg.

Stability 10 Provision shall be made for a safe margin of icpl at all stages of the voyage, regard being given to additions of weight, such as those due to absorption of water and icing and to losses of weight such as those due to consumption of fuel and stores.

From Wikipedia, the free encyclopedia. Article 07 Force Majeure Ingangsdatum: International Load Line Exemption Certificate Official seal Issued under the provisions of the International Convention on Load Line s, under the authority of the Government of full official designation of the country full official designation of the competent person or organization by recognized under the provisions of the International Convention on Load Line sName of ship Distinctive number or letters Port of registry.

  KITAB UL KHARAJ PDF

Article 14 Initial and Periodical Surveys and Inspections 1 A ship shall be subjected to the surveys and inspections specified below: This survey shall be such as to ensure that the arrangements, material and scantlings fully comply with the requirements of the present Convention. Position 1 Upon exposed freeboard and raised quarter decks, and upon exposed superstructure decks situated forward of a point located a quarter of the ship’s length from the forward perpendicular.

Place of issue of certificate. International Convention on Load Lines ICLL ICLL and its Protocol of are a comprehensive set of regulations to determine the minimum allowable freeboard and defines conditions of load line assignment.

International Convention on Load Lines

Article 18 Form of Certificates 1 The certificates shall be drawn up in the official language or languages of the issuing country. Article 09 Approvals for Experimental Purposes Ingangsdatum: Position 2 – Upon exposed superstructure decks situated abaft a quarter of the ship’s length from the forward perpendicular.

Where a superstructure is set in for a part of its length, this modification shall be applied only to the set in part. Doorways in such deckhouses or companionways shall be fitted with doors complying with the requirements of Regulation 12 1. Battens and wedges 11 Battens and wedges shall be efficient and in good condition. Strong angles or metal sockets or equally efficient means shall be provided for securing the uprights.

Ships constructed on or after 1 July shall, as a minimum, comply with the requirements of part A of the IS Code. Permanente link Article 28 Coming into force Ingangsdatum: